国产激情一区二区三区成人AV|亚洲一本一道一区二区三区|亚洲日韩av不卡在线|亚洲一线在线观看

NewsHome > News > Industry dynamics

How many meters can a concrete paver spread a day?
release time:2019-11-14 15:38:00      hit count:2434

圖片2(1).jpg

How many meters can a concrete paver spread a day? The specific number of meters that can be paved is not fixed. It depends on the specific project, the difficulty of the project, and the on-site feeding, the cooperation of the workers, and many factors. And there are weather conditions. Specific engineering specific analysis.

1. Is the personnel scheduling reasonable?

2. Whether the various machines are working properly.

3. Paving the width and thickness of the pavement

4. Paver operator proficiency

5. Model configuration of paver

6. Weather

7. Construction environment (such as the distance of the material yard, the size of the transport vehicle, etc.), etc.

Therefore, how many meters can be spread in a day, there is no way to calculate, generally slow progress can also spread about 500 meters, the speed is fast, 2-3 kilometers a day also.

Welcome information Xuzhou New Road Intelligent Technology Co., Ltd.

Xuzhou Xinlu Intelligent Technology Co., Ltd. was established on January 31, 2019. It is a modern intelligent technology company jointly established by Xuzhou Xinluyuan Machinery Technology Co., Ltd. and Jiangsu Jiji Road Engineering Technology and Equipment Research Institute Co., Ltd.

The company is mainly engaged in multi-functional cement concrete slipform paver, curb stone slipform paver, roadside stone forming machine, water strip sliding mold machine, shoulder molding machine, New Jersey anti-collision guardrail forming machine and other cement concrete pavement maintenance equipment. R & D, manufacturing and sales; provide a variety of cement concrete anti-collision guardrails, gutters, shoulders, curbs / roadside stone and other structural sliding form construction plans; research and extension of the foundation and new materials in cement concrete sliding form Application in paving construction.

圖片3(1).jpg


Previous: How many meters can the curb stone slide be made a day? How is the construction efficiency?
Next: The role of concrete additives in improving concrete sliding form construction

Back to list

News you are interested in
海晏县| 许昌市| 孟州市| 江永县| 澳门| 金昌市| 班戈县| 辛集市| 四川省| 安阳市| 五常市| 宁河县| 大方县| 旌德县| 盐边县| 上犹县| 宜章县| 卫辉市| 武邑县| 阿拉善左旗| 冀州市| 宁夏| 石狮市| 若羌县| 泗阳县| 华亭县| 弋阳县| 嘉禾县| 遂宁市| 图木舒克市| 凌海市| 太白县| 乌鲁木齐市| 北宁市| 阿坝县| 增城市| 上蔡县| 通道| 彰化县| 孝义市| 灵台县|